#4885
V8 Staff
Keymaster

The subframe was media blasted and inspected.

The main welds were reinforced, and the front sway bar holes were drilled out and grade 8 nuts were TIG welded in place. This repaired the stripped out holes in the frame and added a much stronger attachment point for the sway bar mount.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV