#8894
V8 Staff
Keymaster

The metal crew repaired the holes in the floor, and the entire pan was scuffed for new epoxy and coatings.

Bottom side cleaned and seam sealed.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV