#8776
V8 Staff
Keymaster

Most of the work was to be done on the bottom side of the car, so we wrapped the entire outside of the car with several layers of protective film and weld and 3M spark paper to keep it from getting damaged during the process. We also wrapped the dashboard and wrapped headliner to protect it from stray sparks. This paper isn’t cheap, but it’s far cheaper than paint repairs on a nice car!

The car was rolled into the fabrication center where Adam began the chassis disassembly process.

He unbolted the stock rear leaf spring suspension, brakes, and drives haft and slid the 12 bolt rear axle out of the way. We had ordered a Currie Enterprises 9+ rear axle assembly and to take it’s place, but the first task was to install the QUADRALink brackets and narrow the rear frame rails.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV