#8780
V8 Staff
Keymaster

Forming the new strip

The new piece was made on the shrinker / stretcher to bend a 90 degree piece around to match the wheel tub shape.

The new strip was resistance spot-welded to the original welding flange on the new DSE deep tub, and then welded to the original outer tub with a series of tack welds all the way around.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV