#5158
V8 Staff
Keymaster

The new quarter panel is prepped to begin test fitting.

The e-coat is stripped in the weld areas and weld-through primer is sprayed on the bare steel.

Several holes are punched in the areas where the quarter panel will be plug welded to the body structure.

Soon, the quarter panel is hung on the car to evaluate the fit.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV