#5039
V8 Staff
Keymaster

It was determined that a complete floor replacement would be more cost-effective than installing a series of small patches.

The crew removed the engine and transmission, the front sheet metal, and any mechanical linkage is tightening the body to the chassis.

Check out:
V8 Radio Podcast: https://www.v8radio.com
V8TV YouTube Channel: https://www.youtube.com/user/V8TV